Commercial Electrical Service and Maintenance for Large Facilities in Broward and Miami Dade
A large facility runs on its electrical system the way a body runs on its heart. Most of the time nobody thinks about it. Then a main breaker trips on a hot afternoon, or a feeder fails in a production area, and the whole place stops.
Most of those days can be avoided. Not all, but most. The difference between a facility that has electrical surprises every year and one that rarely does is usually a written maintenance program that someone actually follows.
What changed with NFPA 70B
NFPA 70B used to be a recommended practice that a lot of owners never read. Starting with the 2023 edition, it became a standard, and the current 2026 edition keeps it that way. The core requirement is an electrical maintenance program, or EMP, that is documented and run by the facility.
The idea is simple. You inventory your equipment, assess its condition, set maintenance intervals based on that condition, do the work, and keep records. Equipment in good shape gets longer intervals. Equipment in poor shape, in harsh environments or that is critical to the operation gets shorter ones.
Insurers and corporate risk managers are paying attention to this. If your facility does not have an EMP, expect to be asked for one.
What a real program covers
Every facility is different, but a sound program for a large building usually includes:
Infrared thermography. Annual scans of switchgear, panels, MCCs, transformers and disconnects under normal load. It finds loose connections and overloaded equipment before they fail. Our post on infrared thermal imaging goes into detail.
Breaker testing and maintenance. Large power breakers need exercising, cleaning, lubrication and trip testing. A breaker that has not operated in years may not open when it needs to, and that is the scenario that turns a fault into a fire.
Connection torque and cleaning. Dust, moisture and heat cycling loosen connections. Cleaning and retorquing during a planned outage prevents a lot of failures.
Insulation testing. On transformers, feeders and motors, insulation resistance testing shows deterioration over time.
Transfer switches and generators. Monthly exercise, regular inspection and testing under load. A transfer switch that sticks is as bad as a generator that will not start.
Arc flash labels and the study behind them. If equipment or settings have changed since the last study, the labels may be wrong. That is a worker safety problem.
Records. What was tested, what was found, what was fixed and when. Without records, there is no program.
Why South Florida needs more of it
Our climate is hard on electrical equipment. Humidity gets into gear. Salt air near the coast corrodes bus and terminals, and we see it all along the beachfront from Fort Lauderdale to Hollywood to Miami Beach. Outdoor and rooftop gear bakes in the sun. Hurricane season brings surges, outages, water intrusion and long generator runs, all in the same few months.
We recommend scheduling the heavy maintenance in the spring. Thermography, breaker work and generator testing done in March, April or May means your building goes into June with known problems fixed, instead of finding them in August.
Service when something breaks
A maintenance program cuts down on emergency calls, but it does not end them. When something does fail, the techs who already know your building fix it faster. They know where the panels are, how the distribution is laid out and what was found on the last scan.
Our electrical service team works across Broward and Miami Dade, from Doral, Hialeah and Miramar to Pembroke Pines, Plantation and Fort Lauderdale, along with Palm Beach County. We handle troubleshooting, repairs, panel and feeder replacements, generator and transfer switch work, lighting and controls, and the planned outages that a maintenance program needs.
Where to start
If you do not have a program today, start small. Get an equipment inventory. Do an infrared scan. Fix what it finds. Then build the rest of the program around the equipment that matters most to your operation. You do not need to do everything in year one. You need to start and keep records.
A good first inventory lists every piece of gear that would hurt if it failed: the main switchboard, the large breakers, the transformers, the MCCs, the transfer switches and the generator. Note where each one is, what it feeds, and when anyone last touched it. That list alone tells you where the program should start.
Frequently asked questions
What is an electrical maintenance program under NFPA 70B?
It is a written program, run by the facility, that inventories the electrical equipment, assesses its condition, sets maintenance intervals based on that condition, and keeps records of the work. Since the 2023 edition, NFPA 70B is a standard rather than a recommended practice, and the 2026 edition keeps it that way.
How often should electrical equipment be maintained?
It depends on condition. Equipment in good shape gets longer intervals. Equipment in poor shape, in harsh environments or that is critical to the operation gets shorter ones. Infrared scans of the main gear are a sound yearly baseline, and transfer switches and generators get exercised monthly.
When is the best time to schedule heavy electrical maintenance in South Florida?
Spring. Thermography, breaker work and generator testing done in March, April or May means problems are found and fixed before hurricane season, not in the middle of it.
Who does the work?
Pacman HVAC Electric Fire, based at 751 Shotgun Rd in Sunrise, FL 33326. We have done commercial electrical work since 1999 under electrical license EC13006438.
Get on the schedule
Pacman HVAC Electric Fire has worked from our Sunrise shop at 751 Shotgun Rd since 1999, under electrical license EC13006438. Call 954.577.7923, Monday to Friday 7 AM to 5 PM, or request a quote for an electrical maintenance program for your facility. You can also see everything our service team handles.




Comments