Rooftop units take a beating in South Florida. They sit in full sun all year, they breathe salt air if you are anywhere near the coast, and they run almost nonstop from April through October. When one starts failing, the question is not really whether to replace it. It is how to do it without shutting down the building underneath it.

We replace rooftop units on hotels, office buildings, plants and assisted living facilities across Broward and Palm Beach. Here is what owners should think about before the crane shows up.

When an RTU is ready for replacement

Some units can be repaired for years. Others are throwing good money after bad. These are the signs we look at:

  • The compressor has failed, or is close to failing, on an older unit.

  • The coils and cabinet are corroded through, which is common within a few miles of the beach in Boca Raton, Deerfield Beach and Fort Lauderdale.

  • The unit runs an older refrigerant that is getting expensive or hard to find.

  • Repair calls keep coming back for the same unit every summer.

  • The space it serves has changed, so the unit is now the wrong size.

  • The tenants or guests keep complaining about humidity, not just temperature.

That last one matters more here than almost anywhere. An RTU that cools the air but does not pull enough moisture out leaves rooms clammy, and in a hotel or an ALF that turns into mold and complaints fast.

Like for like is not always the right answer

The easy move is to swap the old unit for a new one with the same tonnage. Sometimes that is right. Often it is not. Before ordering equipment, it pays to check:

  • Load. Has the space changed since the original unit went in? More people, more equipment or new windows all change the load.

  • Moisture. Does the space need better dehumidification? Some units handle humid South Florida air much better than others.

  • Curb and structure. Will the new unit fit the existing curb, or does it need an adapter curb or new framing? Can the roof carry it?

  • Electrical. Does the new unit match the existing circuit, disconnect and breaker, or does the electrical need an upgrade too?

  • Controls. Will it tie into the building automation system the facility team already uses?

Because we hold both the HVAC license (CAC1825204) and the electrical license (EC13006438), we look at the mechanical and electrical side together. That avoids the classic problem where the new unit shows up and the feeder or disconnect does not match.

Wind and code on the roof

Broward and Miami Dade are in the High Velocity Hurricane Zone under the Florida Building Code, and Palm Beach has its own strict wind requirements. Rooftop equipment has to be anchored to resist hurricane wind loads, and the attachment details get reviewed at permit. A replacement unit is not just set on the old curb and bolted down the way it was twenty years ago. Plan for engineered tie downs, the right curb and a permit that covers both the mechanical and electrical work.

Planning the change out

A rooftop replacement usually comes down to one long day per unit, sometimes less. The planning is what makes that day go well.

Pick the day. Hotels want a low occupancy stretch. Plants want a planned shutdown or a weekend. ALFs want mild weather, so residents are not without cooling on a hot afternoon.

Plan the crane. Crane lifts need street or parking lot space, sometimes a permit for the lift, and a clear area under the pick. Early morning lifts keep people out of the way.

Keep the space comfortable. If the unit serves a critical area, temporary cooling or portable units can carry the space until the new RTU is running.

Start up and test. A new unit should be started, checked and balanced, not just turned on. We confirm airflow, refrigerant charge, controls and safeties before we leave.

Replace one at a time or all at once

Many buildings have a roof full of units that went in at the same time and are failing on the same schedule. Replacing them in one planned project often saves money on crane time, permits and design, and it lets you fix sizing problems across the whole building. Replacing them one at a time spreads the cost out. Either can work. What does not work is waiting for each one to die in August and paying emergency rates every time.

Frequently asked questions

How long does a rooftop unit last in South Florida?

It depends on the coastal exposure, the maintenance and how hard the unit runs. Units near the beach usually go faster because of salt air corrosion. Regular maintenance and coil cleaning make a real difference.

Can I replace an RTU without changing the curb?

Sometimes. If the new unit has a different footprint, an adapter curb or new framing may be needed, and the anchorage has to meet current wind requirements.

Do I need a permit to replace a rooftop unit?

Yes. RTU replacement needs a permit, and in Broward and Miami Dade the wind anchorage details get reviewed as part of it.

Should I replace all my units at once?

If they are all the same age and failing, a planned group replacement usually saves on crane time, permits and design. If only one is bad, replacing it alone is fine.

Get a plan before summer

Pacman HVAC Electric Fire has served commercial buildings across South Florida since 1999 from our shop at 751 Shotgun Rd in Sunrise. See our HVAC replacement and retrofit work and our HVAC and electrical service team. Call 954.577.7923, Monday to Friday 7 AM to 5 PM, or request a quote to talk through your rooftop units.